Powered by Google TranslateTranslate

    Find.

    Hire.

    Lift.

    Move.

    Nash Plant Group
    Nash Plant Group
    1300 627 474Trade Account
    Nash Plant Group

    Language

    Nash workshop mechanic conducting 10-year major inspection on EWP
    AS 2550.10 Compliance · Sydney & Canberra Workshop

    10-Year Major Inspections & Recertification.

    When elevating work platforms reach their 10-year milestone, AS 2550.10 mandates a comprehensive strip-down assessment. We inspect, recertify, and extend the safe working life of your fleet so your machines stay site-compliant and earning.

    Request Inspection QuoteSpeak to our Workshop Team
    Service Overview

    Protect your asset value and legal compliance.

    Under Australian Standards (AS 2550.10), all Elevating Work Platforms (EWPs) — including scissor lifts, boom lifts, telehandlers, and spider lifts — must undergo a major inspection at 10 years of age, and every 5 years thereafter.

    Running plant past its due date renders it non-compliant for Tier 1 construction sites, invalidates insurance coverage, and poses severe workplace safety risks. At Nash Plant Group, our qualified heavy plant mechanics handle the entire process from strip-down to NDT crack testing, component renewal, engineering sign-off, and new compliance plating.

    AS 2550.10 Compliance Plating
    NDT Crack & Structural Testing
    Full Mechanical & Hydraulic Overhaul
    Engineering Sign-off Documentation
    In-House Skilled Technicians
    Sydney (Ingleburn) & Canberra (Fyshwick)

    Inspection Scope

    • Structural & Load-Path Assessment

      Chassis, boom sections, scissor stack, pins, and slew ring thoroughly cleaned and inspected.

    • Non-Destructive Testing (NDT)

      Magnetic particle and ultrasonic testing coordinated across all critical structural welds.

    • Hydraulic System Overhaul

      Hoses, cylinders, valves, and pumps pressure-tested, resealed, or replaced.

    • Electrical & Safety Systems

      Wiring harnesses, tilt sensors, limit switches, and emergency lowering systems verified.

    • Full Recertification & Plating

      Official 10-year major compliance plate attached with a complete engineering logbook.

    How It Works

    Transparent 3-Step Process.

    A structured engineering approach designed to minimize downtime and return your machine to full working specification.

    01

    Assessment & Strip-Down

    The unit is brought to our workshop, completely washed, and systematically stripped to expose all structural welds, hydraulic rams, pins, and bushings.

    02

    NDT & Mechanical Overhaul

    Certified NDT technicians test load-bearing welds. Worn pins, bearings, hydraulic hoses, and electrical components are replaced with genuine parts.

    03

    Load Testing & Certification

    The machine undergoes full function testing under rated load, final safety calibration, and receives an official AS 2550.10 compliance plate and logbook.

    Frequently Asked Questions

    Major Inspection FAQs.

    Key insights on standards, turnaround times, and statutory requirements for Australian plant owners.

    Get Started

    Ready to book your 10-year major inspection?

    Provide your equipment make, model, and serial details and our workshop manager will assess your timeline and provide a fixed quote.

    Request Inspection QuoteCall 1300 627 474

    Servicing depots: Ingleburn (Sydney) & Fyshwick (Canberra)

    Original text
    Rate this translation
    Your feedback will be used to help improve Google Translate